(a)   The State shall pay its share of:
    (1)   the annual operating costs of furnishing water and sewer service to any
State facility; and
    (2)   the lateral system construction costs associated with the installation
of any water or sewer line that directly serves the State facility.
  (b)   The State shall pay the cost of expanding a water or sewage treatment
facility if the expansion is necessitated by the use of the facility by
the State. However, the amount the State pays may not exceed the cost
of the capacity required by the State.
|